F.O. Day paver working overnight on MD 185
Projects  ·  Highway, paving and site work

Work thatwins awards.

Highway, paving and site projects across Maryland, with the client, scope and key numbers for each.

MD 185  ·  overnight paving
510,000
Tons of asphalt
on the ICC
3M
Cubic yards of earth
at Arundel Mills
5 awards
Excellence in Paving
for 2023 to 2025 work
IRI 59
Ride quality
on MD 194
Featured projects

Every job.One standard.

Award winning resurfacing, new roads and some of the largest site and paving jobs in our history. Tap a project for the details.

Aerial view of the Intercounty Connector (MD 200), a six lane highway through Maryland
Maryland

Intercounty Connector

Major highway construction and asphalt paving

F.O. Day produced, hauled and placed about 510,000 tons of hot mix asphalt to build Maryland's Intercounty Connector, a new six lane highway with full width shoulders. It was one of the company's largest continuous paving operations in Maryland, with asphalt plants, trucking fleets and field crews working together ahead of the highway's scheduled November 2011 opening.

Crews built the pavement in layers: high strength binder and intermediate courses, then premium surface mixes designed for heavy trucks and high traffic. Along the way, F.O. Day set a company record of 6,072 tons of asphalt placed in a single shift.

The work also included milling and profile adjustments where the new highway meets Georgia Avenue, Layhill Road, New Hampshire Avenue and US 29, for smooth transitions to the new pavement and bridge approaches. Crews worked within seasonal temperature limits, quality control testing and state inspections, and carefully managed milling debris, dust and asphalt waste near environmentally sensitive areas.

510,000
Tons of asphalt
6,072
Tons in one shift, a company record
Client
Maryland State Highway Administration (SHA)
Dates
November 2010 to November 2011
Contract value
$35M

Scope of work

  • Production, hauling and placement of about 510,000 tons of hot mix asphalt
  • New structural pavement for a six lane highway and full width shoulders
  • High strength binder, intermediate and premium surface courses
  • Milling and profile milling at existing roadway connections
  • Roadway profile and cross slope adjustments
  • Environmental controls and pavement quality assurance
All projects
Aerial view of the Arundel Mills site under construction, scrapers moving earth, from the F.O. Day archive
Maryland

Arundel Mills Site Development

Large scale earthwork and infrastructure

One of the largest site development projects in F.O. Day's history: preparing the Arundel Mills site and building the infrastructure for the retail development.

Crews cleared about 267 acres, moved about 3 million cubic yards of earth and installed roughly five miles of 84 inch pipe at depths near 50 feet. The stormwater management pond was, at the time, the largest in Maryland.

267
Acres cleared
3M
Cubic yards of earthwork
5 mi
Of 84 inch pipe
50 ft
Deep, about

Scope of work

  • About 267 acres of clearing
  • About 3 million cubic yards of earthwork
  • Roughly five miles of 84 inch pipe
  • Underground installation at depths near 50 feet
  • Major stormwater management facility
All projects
Aerial view of US 340 in Frederick County, Maryland, with ramp extension work under way between lanes of moving trafficUnder construction
F.O. Day crew at a concrete barrier on US 340 as traffic passes, with graded ground for a new ramp on the other side
Straight down drone view of a graded strip for an acceleration ramp extension between two roadways on US 340
Frederick County, Maryland

US 340 Acceleration Ramp Extensions

Improving safety and traffic flow in Frederick County, Maryland

As communities around Brunswick continue to grow, so does the demand on the highways connecting residents to work, schools, and neighboring communities. Along US 340, acceleration ramps built more than 60 years ago no longer provide the merging distance needed for today's traffic volumes and speeds.

F.O. Day is helping address that challenge through a $17.4 million highway improvement project for the Maryland State Highway Administration (SHA). The project extends five acceleration ramps at three interchanges, MD 17, MD 180, and US 15, giving motorists more room to accelerate, merge safely, and keep traffic moving.

With construction taking place across multiple locations while US 340 remains open, F.O. Day is coordinating crews, subcontractors, traffic control, and construction sequencing to deliver these improvements while minimizing disruption to the traveling public.

5
Acceleration ramps extended
3
Interchanges on US 340
60+ yrs
Age of the old ramps
Client
Maryland State Highway Administration, District 7
Location
Frederick County, Maryland
Contract value
$17.4M
Construction
2025 to 2027 (anticipated)
Services
Heavy highway construction

Scope of work

  • Five acceleration ramp extensions at three US 340 interchanges
  • Interchanges at MD 17, MD 180 and US 15
  • Traffic control and construction sequencing while US 340 stays open
All projects
Fresh asphalt on the resurfaced Capital BeltwayAward winner
New lane markings on the resurfaced I-495
Capital Beltway, Maryland

I-495 Interstate Resurfacing

Inner and Outer Loop resurfacing
2023 Maryland Excellence in Paving Award, Interstate Resurfacing. Maryland Asphalt Association and Maryland State Highway Administration, presented March 2024.

F.O. Day resurfaced sections of the Capital Beltway's Inner and Outer Loops, from east of Seminary Road to the Prince George's County line eastbound, and from the county line to 800 feet west of MD 193 westbound.

Crews placed about 27,400 tons of stone matrix asphalt for a new 2 inch surface, plus pavement markings and rumble strips.

27,400
Tons of stone matrix asphalt
2 in
New surface course
Client
Maryland Department of Transportation State Highway Administration, District 3
Completed
September 2023
Contract
MO033F5F / XY7155177
Contract value
$20.4M

Scope of work

  • Interstate asphalt resurfacing
  • 2 inch surface course of 12.5 mm stone matrix asphalt
  • Pavement markings
  • Rumble strips
All projects
New double yellow lines on resurfaced US 15 in Frederick CountyAward winner
Frederick County, Maryland

US 15 Resurfacing

Basford Road to US 340
2023 Maryland Excellence in Paving Award, Primary Resurfacing. Presented March 2024.

About four miles of US 15 near Jefferson, Maryland: milling, patching, leveling, resurfacing and pavement markings on the main road, shoulders and interchange ramps.

Crews placed about 16,100 tons of asphalt while managing nighttime lane closures and traffic. The award recognized ride quality, compaction and joint quality.

16,100
Tons of asphalt
4 mi
Of US 15, about
Client
Maryland State Highway Administration (MDOT SHA), District 7
Completed
August 2023
Contract
FR761C53 / XY9105177

Scope of work

  • Pavement milling
  • Patching and leveling
  • Asphalt resurfacing of main road, shoulders and ramps
  • Pavement markings
All projects
The F.O. Day team with the MD 30 Excellence in Paving award plaquesAward winner
Excellence in Paving award plaque for MD 30, Secondary Resurfacing
F.O. Day presenting the MD 30 project at the Maryland Asphalt Association conference
Maryland

MD 30 Roadway Resurfacing

MD 30 Bypass to North Woods Trail Road
Maryland Excellence in Paving Award, Secondary Resurfacing. Presented March 2026 at the 62nd Annual Maryland Asphalt Association Paving Conference.

F.O. Day resurfaced a one mile stretch of Maryland Route 30, a busy corridor serving local businesses and heavy truck traffic, including tractor trailers.

Crews repaired failed pavement with full depth patching, milled the old surface and placed a new 2 inch asphalt overlay, with traffic control that kept vehicles moving and delays short for nearby businesses.

1 mi
Of MD 30
2 in
New asphalt overlay
Client
Maryland Department of Transportation State Highway Administration (MDOT SHA), District 7
Contract
CL410C53 / XY9065177

Scope of work

  • Full depth asphalt patching with 19 mm mix
  • 2 inch surface milling
  • 2 inch surface paving with 12.5 mm mix
  • Traffic control and maintenance of access
All projects
Fresh asphalt and new lane markings on resurfaced MD 194Award winner
The F.O. Day team with Maryland Excellence in Paving award plaques
Maryland

MD 194 Resurfacing

Baltimore Street to Kenan Street
2024 Maryland Excellence in Paving Award, Secondary Resurfacing. Presented March 2025.

F.O. Day resurfaced a 0.75 mile section of Maryland Route 194, from Baltimore Street to Kenan Street.

Crews placed about 3,300 tons of 2 inch, 12.5 mm surface mix made with 45 percent reclaimed asphalt pavement (RAP). The finished road reached an International Roughness Index (IRI) of 59, a mark of excellent ride quality, with clean joints, transitions and tie ins.

3,300
Tons of asphalt
45%
Recycled asphalt (RAP)
IRI 59
Ride quality score
Client
Maryland Department of Transportation State Highway Administration (MDOT SHA), District 7
Completed
May 2024
Contract
CL410B59 / XY9065177

Scope of work

  • 2 inch surface paving with 12.5 mm mix
  • 45 percent reclaimed asphalt pavement
  • Joints, transitions and tie ins
All projects
Resurfaced street and new crosswalk in the Rock Creek Terrace subdivision, RockvilleAward winner
Rockville, Maryland

Rock Creek Terrace Subdivision

Neighborhood road repair and resurfacing
2023 Maryland Excellence in Paving Award, County Subdivision Resurfacing. Presented March 2024.

Repair and resurfacing of neighborhood roads in the Rock Creek Terrace subdivision, between Robindale Drive and Veirs Mill Road.

Crews placed about 7,000 tons of 9.5 mm surface mix at 2 inches deep, plus 400 tons of base patching, with close attention to ride quality, compaction, joints and tie ins.

7,000
Tons of surface mix
400
Tons of base patching
Client
Montgomery County, Maryland
Completed
2023
Contract
Montgomery County No. 1088535

Scope of work

  • Roadway repair
  • Asphalt base patching
  • 2 inch resurfacing with 9.5 mm surface mix
All projects
F.O. Day paving crew placing asphalt at School Alley on the Burtonsville Access Road project
New retaining wall under construction on the Burtonsville Access Road project
Burtonsville, Maryland

Burtonsville Access Road

New roadway construction

F.O. Day built a new roadway connection between Spencerville Road (MD 198) and School Access Road, improving access to Burtonsville businesses and supporting a more connected, pedestrian friendly downtown.

The project combined roadway construction with sidewalks, a shared use path, street lighting and landscaping. Working through two wetlands, crews coordinated clearing, grading, drainage, retaining walls and environmental controls before asphalt paving and permanent stabilization. Sidewalks and a 10 foot shared use path connect pedestrians and cyclists.

Substantial completion came on April 16, 2026, nearly three months ahead of the July 8 contract completion date.

3 mo
Ahead of schedule, nearly
2
Wetlands crossed
10 ft
Shared use path
Client
Montgomery County, Maryland
Value
$10.8M
Substantial completion
April 16, 2026

Scope of work

  • Clearing, grading and new roadway construction
  • Erosion and sediment controls, including a sediment basin
  • Storm drain and underdrain installation
  • Retaining walls, curb and gutter, and sidewalks
  • 10 foot shared use path
  • Asphalt paving
  • Electrical poles, conduit and wiring
  • Stormwater management pond and landscaping
  • Permanent stabilization with sod
All projects
F.O. Day paving crew placing asphalt on MD 68
F.O. Day screed operator on the MD 68 paver
F.O. Day dump truck on freshly paved MD 68
Washington County, Maryland

MD 68 Roadway Improvements

US 40 Alternate to Barnes Road

F.O. Day improved two miles of MD 68, from US 40 Alternate to Barnes Road, restoring worn pavement and delivering a smoother ride.

The narrow, winding two lane road meant careful work around tight curves and limited shoulders while keeping access open for local traffic. Crews rebuilt failing areas with full depth patching, then used wedge and level paving to even out the profile before the final asphalt overlay.

2 mi
Of MD 68
2 in
Asphalt surface

Scope of work

  • 2 inch surface milling
  • Full depth asphalt patching
  • 1 inch wedge and level paving
  • 2 inch asphalt surface paving
  • Centerline rumble strips and thermoplastic markings
All projects
F.O. Day paver working overnight on MD 185
F.O. Day crew paving MD 185 under work lights
Roller compacting fresh asphalt at night on MD 185
Maryland

MD 185 Roadway Improvements

Overnight construction

Roadway improvements on MD 185, built through overnight operations to keep daytime traffic moving.

Night work takes careful planning. Crews coordinate traffic control, work zone visibility and equipment moves so motorists keep moving and the work stays safe and efficient.

Night
Overnight operations
Client
Maryland State Highway Administration (SHA)
Contract
Part of an areawide paving contract
All projects
FAQ

Commonquestions.

How do I request a quote or invite you to bid?

Use the Invite Us to Bid button on this site, call (301) 652-2400, or email our estimating department at estimating@foday.com. We aim to respond within 24 hours.

Which areas do you serve?

F.O. Day serves communities throughout central and southern Maryland and Northern Virginia.

In Virginia, we serve Loudoun, Fairfax and Arlington counties. In Maryland, we serve every county except Allegany, Baltimore, Caroline, Cecil, Dorchester, Garrett, Harford, Kent, Queen Anne's, Somerset, Talbot, Wicomico and Worcester.

Contact our team to discuss your project and confirm service in your area.

Do you take residential work like driveways?

We focus on commercial projects, public infrastructure and residential developments. We do not offer individual residential driveway paving.

Estimating  ·  DC, Maryland, Virginia

Your project next?Invite us.