Work thatwins awards.
Highway, paving and site projects across Maryland, with the client, scope and key numbers for each.
on the ICC
at Arundel Mills
for 2023 to 2025 work
on MD 194
Every job.One standard.
Award winning resurfacing, new roads and some of the largest site and paving jobs in our history. Tap a project for the details.

Intercounty Connector
View project
Arundel Mills Site Development
View project
Under constructionUS 340 Acceleration Ramp Extensions
View project
Award winnerI-495 Interstate Resurfacing
View project
Award winnerUS 15 Resurfacing
View project
Award winnerMD 30 Roadway Resurfacing
View project
Award winnerMD 194 Resurfacing
View project
Award winnerRock Creek Terrace Subdivision
View project
Burtonsville Access Road
View project
MD 68 Roadway Improvements
View project
MD 185 Roadway Improvements
View project
Intercounty Connector
F.O. Day produced, hauled and placed about 510,000 tons of hot mix asphalt to build Maryland's Intercounty Connector, a new six lane highway with full width shoulders. It was one of the company's largest continuous paving operations in Maryland, with asphalt plants, trucking fleets and field crews working together ahead of the highway's scheduled November 2011 opening.
Crews built the pavement in layers: high strength binder and intermediate courses, then premium surface mixes designed for heavy trucks and high traffic. Along the way, F.O. Day set a company record of 6,072 tons of asphalt placed in a single shift.
The work also included milling and profile adjustments where the new highway meets Georgia Avenue, Layhill Road, New Hampshire Avenue and US 29, for smooth transitions to the new pavement and bridge approaches. Crews worked within seasonal temperature limits, quality control testing and state inspections, and carefully managed milling debris, dust and asphalt waste near environmentally sensitive areas.
- Client
- Maryland State Highway Administration (SHA)
- Dates
- November 2010 to November 2011
- Contract value
- $35M
Scope of work
- Production, hauling and placement of about 510,000 tons of hot mix asphalt
- New structural pavement for a six lane highway and full width shoulders
- High strength binder, intermediate and premium surface courses
- Milling and profile milling at existing roadway connections
- Roadway profile and cross slope adjustments
- Environmental controls and pavement quality assurance

Arundel Mills Site Development
One of the largest site development projects in F.O. Day's history: preparing the Arundel Mills site and building the infrastructure for the retail development.
Crews cleared about 267 acres, moved about 3 million cubic yards of earth and installed roughly five miles of 84 inch pipe at depths near 50 feet. The stormwater management pond was, at the time, the largest in Maryland.
Scope of work
- About 267 acres of clearing
- About 3 million cubic yards of earthwork
- Roughly five miles of 84 inch pipe
- Underground installation at depths near 50 feet
- Major stormwater management facility
Under construction

US 340 Acceleration Ramp Extensions
As communities around Brunswick continue to grow, so does the demand on the highways connecting residents to work, schools, and neighboring communities. Along US 340, acceleration ramps built more than 60 years ago no longer provide the merging distance needed for today's traffic volumes and speeds.
F.O. Day is helping address that challenge through a $17.4 million highway improvement project for the Maryland State Highway Administration (SHA). The project extends five acceleration ramps at three interchanges, MD 17, MD 180, and US 15, giving motorists more room to accelerate, merge safely, and keep traffic moving.
With construction taking place across multiple locations while US 340 remains open, F.O. Day is coordinating crews, subcontractors, traffic control, and construction sequencing to deliver these improvements while minimizing disruption to the traveling public.
- Client
- Maryland State Highway Administration, District 7
- Location
- Frederick County, Maryland
- Contract value
- $17.4M
- Construction
- 2025 to 2027 (anticipated)
- Services
- Heavy highway construction
Scope of work
- Five acceleration ramp extensions at three US 340 interchanges
- Interchanges at MD 17, MD 180 and US 15
- Traffic control and construction sequencing while US 340 stays open
Award winner
I-495 Interstate Resurfacing
F.O. Day resurfaced sections of the Capital Beltway's Inner and Outer Loops, from east of Seminary Road to the Prince George's County line eastbound, and from the county line to 800 feet west of MD 193 westbound.
Crews placed about 27,400 tons of stone matrix asphalt for a new 2 inch surface, plus pavement markings and rumble strips.
- Client
- Maryland Department of Transportation State Highway Administration, District 3
- Completed
- September 2023
- Contract
- MO033F5F / XY7155177
- Contract value
- $20.4M
Scope of work
- Interstate asphalt resurfacing
- 2 inch surface course of 12.5 mm stone matrix asphalt
- Pavement markings
- Rumble strips
Award winnerUS 15 Resurfacing
About four miles of US 15 near Jefferson, Maryland: milling, patching, leveling, resurfacing and pavement markings on the main road, shoulders and interchange ramps.
Crews placed about 16,100 tons of asphalt while managing nighttime lane closures and traffic. The award recognized ride quality, compaction and joint quality.
- Client
- Maryland State Highway Administration (MDOT SHA), District 7
- Completed
- August 2023
- Contract
- FR761C53 / XY9105177
Scope of work
- Pavement milling
- Patching and leveling
- Asphalt resurfacing of main road, shoulders and ramps
- Pavement markings
Award winner

MD 30 Roadway Resurfacing
F.O. Day resurfaced a one mile stretch of Maryland Route 30, a busy corridor serving local businesses and heavy truck traffic, including tractor trailers.
Crews repaired failed pavement with full depth patching, milled the old surface and placed a new 2 inch asphalt overlay, with traffic control that kept vehicles moving and delays short for nearby businesses.
- Client
- Maryland Department of Transportation State Highway Administration (MDOT SHA), District 7
- Contract
- CL410C53 / XY9065177
Scope of work
- Full depth asphalt patching with 19 mm mix
- 2 inch surface milling
- 2 inch surface paving with 12.5 mm mix
- Traffic control and maintenance of access
Award winner
MD 194 Resurfacing
F.O. Day resurfaced a 0.75 mile section of Maryland Route 194, from Baltimore Street to Kenan Street.
Crews placed about 3,300 tons of 2 inch, 12.5 mm surface mix made with 45 percent reclaimed asphalt pavement (RAP). The finished road reached an International Roughness Index (IRI) of 59, a mark of excellent ride quality, with clean joints, transitions and tie ins.
- Client
- Maryland Department of Transportation State Highway Administration (MDOT SHA), District 7
- Completed
- May 2024
- Contract
- CL410B59 / XY9065177
Scope of work
- 2 inch surface paving with 12.5 mm mix
- 45 percent reclaimed asphalt pavement
- Joints, transitions and tie ins
Award winnerRock Creek Terrace Subdivision
Repair and resurfacing of neighborhood roads in the Rock Creek Terrace subdivision, between Robindale Drive and Veirs Mill Road.
Crews placed about 7,000 tons of 9.5 mm surface mix at 2 inches deep, plus 400 tons of base patching, with close attention to ride quality, compaction, joints and tie ins.
- Client
- Montgomery County, Maryland
- Completed
- 2023
- Contract
- Montgomery County No. 1088535
Scope of work
- Roadway repair
- Asphalt base patching
- 2 inch resurfacing with 9.5 mm surface mix


Burtonsville Access Road
F.O. Day built a new roadway connection between Spencerville Road (MD 198) and School Access Road, improving access to Burtonsville businesses and supporting a more connected, pedestrian friendly downtown.
The project combined roadway construction with sidewalks, a shared use path, street lighting and landscaping. Working through two wetlands, crews coordinated clearing, grading, drainage, retaining walls and environmental controls before asphalt paving and permanent stabilization. Sidewalks and a 10 foot shared use path connect pedestrians and cyclists.
Substantial completion came on April 16, 2026, nearly three months ahead of the July 8 contract completion date.
- Client
- Montgomery County, Maryland
- Value
- $10.8M
- Substantial completion
- April 16, 2026
Scope of work
- Clearing, grading and new roadway construction
- Erosion and sediment controls, including a sediment basin
- Storm drain and underdrain installation
- Retaining walls, curb and gutter, and sidewalks
- 10 foot shared use path
- Asphalt paving
- Electrical poles, conduit and wiring
- Stormwater management pond and landscaping
- Permanent stabilization with sod



MD 68 Roadway Improvements
F.O. Day improved two miles of MD 68, from US 40 Alternate to Barnes Road, restoring worn pavement and delivering a smoother ride.
The narrow, winding two lane road meant careful work around tight curves and limited shoulders while keeping access open for local traffic. Crews rebuilt failing areas with full depth patching, then used wedge and level paving to even out the profile before the final asphalt overlay.
Scope of work
- 2 inch surface milling
- Full depth asphalt patching
- 1 inch wedge and level paving
- 2 inch asphalt surface paving
- Centerline rumble strips and thermoplastic markings



MD 185 Roadway Improvements
Roadway improvements on MD 185, built through overnight operations to keep daytime traffic moving.
Night work takes careful planning. Crews coordinate traffic control, work zone visibility and equipment moves so motorists keep moving and the work stays safe and efficient.
- Client
- Maryland State Highway Administration (SHA)
- Contract
- Part of an areawide paving contract
Commonquestions.
How do I request a quote or invite you to bid?
Use the Invite Us to Bid button on this site, call (301) 652-2400, or email our estimating department at estimating@foday.com. We aim to respond within 24 hours.
Which areas do you serve?
F.O. Day serves communities throughout central and southern Maryland and Northern Virginia.
In Virginia, we serve Loudoun, Fairfax and Arlington counties. In Maryland, we serve every county except Allegany, Baltimore, Caroline, Cecil, Dorchester, Garrett, Harford, Kent, Queen Anne's, Somerset, Talbot, Wicomico and Worcester.
Contact our team to discuss your project and confirm service in your area.
Do you take residential work like driveways?
We focus on commercial projects, public infrastructure and residential developments. We do not offer individual residential driveway paving.